FYI, there is an Elings Hall power outage *tentatively* scheduled for Monday, August 21st. I'll keep you posted if it stays or gets rescheduled.
Matthew
-----Original Message-----
From: Bob Hanson [mailto:bhanson at cnsi.ucsb.edu]
Sent: Thursday, August 10, 2017 11:20 AM
To: Daniel Morse <d_morse at lifesci.ucsb.edu>; Jon Schuller <jonschuller at ece.ucsb.edu>; Yon Visell <yonvisell at ece.ucsb.edu>; Megan Valentine <valentine at engineering.ucsb.edu>; Craig Hawker <hawker at mrl.ucsb.edu>; Luke Theogarajan <ltheogar at ece.ucsb.edu>; Michael Chabinyc <mchabinyc at engineering.ucsb.edu>; Kaustav Banerjee <kaustav at ece.ucsb.edu>; Fred Wudl <wudl at chem.ucsb.edu>; Otger Campàs <campas at engineering.ucsb.edu>; Stephen Wilson <stephendwilson at engr.ucsb.edu>; George Legrady <legrady at arts.ucsb.edu>; Marcos Novak <marcos at mat.ucsb.edu>; JoAnn Kuchera-Morin <jkm at create.ucsb.edu>; Curtis Roads <clang at create.ucsb.edu>; Marko Peljhan <peljhan at mat.ucsb.edu>; Sumita Pennathur <sumita at engr.ucsb.edu>; Matthew Turk <mturk at cs.ucsb.edu>; Mark Cornish <cornish at engineering.ucsb.edu>; Jerry Hu <jghu at mrl.ucsb.edu>; Youli Li <youli at mrl.ucsb.edu>; robert Levenson <robert.levenson at lifesci.ucsb.edu>; Dave Bothman <bothman at engineering.ucsb.edu>; Luke Theogarajan <ltheogar at ece.ucsb.edu>; Jon Schuller <jonschuller at ece.ucsb.edu>; Stephen Wilson <stephendwilson at engr.ucsb.edu>; Julia Schneider <jschneider at mrl.ucsb.edu>; Bob Lansdorp <bob.lansdorp at gmail.com>; Abby Knight <aknight at mrl.ucsb.edu>; Renwei Chen <rchen at engr.ucsb.edu>; Emmanouela Filippidi <filippidi at mrl.ucsb.edu>; Megan Valentine <valentine at engineering.ucsb.edu>; Paul Weakliem <weakliem at cnsi.ucsb.edu>; George Legrady <legrady at arts.ucsb.edu>; JoAnn Kuchera-Morin <jkm at create.ucsb.edu>; Steven Brown <sbrown at engineering.ucsb.edu>; Kaustav Banerjee <kaustav at ece.ucsb.edu>; Lee Sawyer <l_sawyer at cnsi.ucsb.edu>; Larry Zins <larry at mat.ucsb.edu>; Yon Visell <yonvisell at ece.ucsb.edu>; Jennifer Smith <jsmith at cnsi.ucsb.edu>; Michael Chabinyc <mchabinyc at engineering.ucsb.edu>; Naveen Venkatesan <naveen_venkatesan at umail.ucsb.edu>; Athina Anastasaki <athina at cnsi.ucsb.edu>; Michelle O'Malley <momalley at engineering.ucsb.edu>; Logan Garner <logan at laxmitherapeuticdevices.com>; Vinu Krishnan <vinu at engineering.ucsb.edu>; Holly Woo <woo at cnsi.ucsb.edu>; Sean Fraer <seanfr at microsoft.com>; Ofelia Aguirre <aguirre at cnsi.ucsb.edu>; Wendy Ibsen <ibsen at cnsi.ucsb.edu>; Mason Thomas <Mason.Thomas at microsoft.com>; Daniel Daniels <daniels at cnsi.ucsb.edu>; Eva Deloa <deloa at cnsi.ucsb.edu>; Jessica Ajao <jsajao at cnsi.ucsb.edu>; Tal Margalith <margalith at cnsi.ucsb.edu>; Holly Woo <woo at cnsi.ucsb.edu>; Sonya Perez <sperez at cnsi.ucsb.edu>; Lynne Leininger <lynnel at cnsi.ucsb.edu>; Paul Weakliem <weakliem at cnsi.ucsb.edu>; Teddy Thomas <tthomas at cnsi.ucsb.edu>; Lee Sawyer <l_sawyer at cnsi.ucsb.edu>; Jennifer Smith <jsmith at cnsi.ucsb.edu>; Dave Bothman <bothman at engineering.ucsb.edu>; Jessica Henry <jhenry at cnsi.ucsb.edu>; Fuzzy Rogers <FUZ at MRL.UCSB.EDU>
Subject: Power Shutdown Update
Thank you for all the productive feedback you've been sending. This is what I can say about the proposed outage at this time: The Project Manager is looking into the option of a Saturday schedule, but there are numerous hurdles to address still and I am not fully confident this will be possible. Another alternative is to consider a T-W-Th (22-23-24) option for the outage. While this does not solve everyone's problem is does solve some that I am aware of. If one of these days would also work better for you and you haven't already let me know, please do so as soon as possible.
Lastly, the best estimate available for the duration of the outage is 8 hrs. I will have to use email updates on the fly to give anything more useful for those who need to monitor the switches to and from e-power.
FM technicians will be on hand to ensure power, HVAC, compressors, DI, etc. return to normal service. For those wondering, walk in cold rooms are on e-power.
The issue of idle staff and researchers is not an easy one to resolve.
If some of you global thinkers have a suggestion, please share it with me (but please don't start a 60-way dialogue with reply all). Some ideas already include: work remotely, take a vacation day, reschedule events, . . . We will post our plans once we decide on a schedule.
One last thought: While this is the 4th or 5th solar panel project on campus, we are the first exclusively research oriented building to be impacted by the inevitable shutdown, so some of the challenges we face have not been addressed before. We appreciate everyone's help and patience in getting through this major event.
Regards,
Bob
Original message:
A power outage is proposed for August 21st, Monday, starting at 6:00am and lasting all day to allow contractors to plug in the newly assembled solar panels on lot 10 to the switch gear at the north end of our building. Only emergency power circuits will be available to power established emergency loads in the building - please do not switch non-essential loads to e-power during this time frame; risks to all e-power loads could occur. It would be wise to be on hand during the initial switch over (6am to 8am) to ensure your e-power loads are operating correctly. All normal power loads should be powered down by 6:00am Monday the 21st to avoid inadvertent damage that may occur during power switching.
If you have particular concerns about this outage please contact me as soon as possible. Please pass the word to your groups.